SECTIONS of the roof at the Anna Regina National Stadium in Essequibo were ripped off after heavy winds and persistent rainfall battered parts of Guyana on Wednesday.
The damage comes at the worst possible time for local officials, with the facility currently in its final stages of preparation ahead of a highly anticipated scheduled opening on July 3.
Preliminary reports confirmed that strong gusts associated with the severe weather system tore through the site, leaving visible structural damage. However, authorities have confirmed that no injuries were reported during or after the incident.
Emergency repair teams have already been mobilised and are expected to begin restoration works immediately. Project engineers are also on-site, conducting a full assessment to determine whether additional reinforcement will be required before the venue is officially commissioned.
The adverse weather conditions caused widespread disruption across the Essequibo Coast and other parts of Guyana, with reports of fallen branches and temporary power outages.
The Anna Regina stadium is a major project for the area, designed to serve as a key sporting hub. Its inauguration is highly anticipated as part of a broader government push to expand sports infrastructure in Region Two.
Meteorological officials are continuing to monitor weather patterns, with intermittent rainfall and wind gusts forecast to persist over the coming days. Local residents have been urged to remain alert and take necessary precautions.
Authorities say further updates will be provided as repair work progresses and structural assessments continue at the stadium.







