THE government’s efforts to preserve Dakoura Creek, which will eventually be the sole source of water for Linden residents through the Dakoura Creek Protection Strategy, have seen many successes.
This is according to Guyana Water Inc. consultant Samuel Wright who has been instrumental in preparing the management plan and has given a lot of energies and resources to the success of the plan.
The plan commenced in 2015 with support funding from the International Development Bank (IDB) and since then the project has seen the construction of a new treatment plant on the Dakoura Creek and the completion of supporting transmission and distribution systems.
The implementation of the plan includes investigations and analysis of the content, including water quality monitoring, gauging of the Dakoura Creek, and public awareness, outreach and education programmes.
Wright said he has exerted a lot of energies in educating and bringing awareness to residents of Linden on the importance of the protection of the watershed.
“The overriding consideration is that uninformed development. The lack of awareness of the watershed processes and lack of regulatory oversight threaten and could undermine the integrity of the watershed, and impair the primary designated use,” an excerpt from the executive summary of the strategic plan noted.
THREATS REMAIN
Wright is hopeful that funding will be made available for the implementation of the plan since several of the initial threats to the watershed still remain today. Three of these are indiscriminate garbage dumping, unauthorised mining and residential squatting. Wright alleged that a private garbage collection company operating in Linden continues to dump at the watershed.
A key aspect of the management strategy is to have the Dakoura Creek Watershed (DCW) awarded special protective status.
This would facilitate immediate protection of the resources while monitoring and characterisation programmes are developed and implemented.
Wright said he would not fully advocate for the removal of residents and farmers, but the focus should be on educating these on what activities can be harmful to the watershed.
Signs have been placed at strategic areas of the watershed in an effort to raise awareness of its preservation. Wright is calling for all supporting stakeholders to play their role in protecting this very important water source in Linden.
When the implementation phase is completed, residents of Wismar will receive improved water supply and quality.
The Dakoura Creek Watershed is one of five watersheds in Linden, all sub-basins of the Demerara River Watershed. It is approximately 13 kilometres long and 7 kilometres wide.
Access through the DCW is by bauxite haul roads, abandoned logging trails, survey lines and unsurfaced roads within and from the housing developments.
Land use within the DCW includes bauxite and laterite mining and squatting.







